ASTM E2128 PDF

Standard: ASTM E – 12 – Standard Guide for Evaluating Water Leakage in Building Walls. Scope: This guide describes methods for determining and. ASTM E is designed to be a systematic approach that determines the cause of water leakage. Are you ready to get started? Contact TSI!. Summary of ASTM Ea Standard. Guide for Evaluating Water Leakage of. Building Walls. • Continue the Property Analysis Seminar.

Author: Moogunos Nekora
Country: Norway
Language: English (Spanish)
Genre: Relationship
Published (Last): 14 January 2011
Pages: 324
PDF File Size: 1.53 Mb
ePub File Size: 12.63 Mb
ISBN: 739-1-82910-532-7
Downloads: 50138
Price: Free* [*Free Regsitration Required]
Uploader: JoJobar

Link to Active This link will qstm route to the current Active version of the standard. A statement stipulating the limits of the investigation should be included in the report.

ASTM E2128 – 12

For this purpose, water penetration is considered leakage, and therefore problematic, if it exceeds the planned resistance or temporary retention and drainage capacity of the wall, is causing or is f2128 to cause premature deterioration of a building or its contents, or is adversely affecting the performance of other components.

It is the responsibility of the investigator to establish the limitations of use, to anticipate and advise of the destructive nature of some procedures, and to plan for patching and selective reconstruction as necessary. It is not intended for use with structures designed to retain water, such as pools and fountains.

The methodology in this guide is intended to address intrinsic leakage behavior properties of a wall system, leading to conclusions that generally apply to similar locations on the building. Someone that is not familiar with the above standards should not use this guide, as it is the responsibility of the investigator to establish limitations of use, to identify limitations of the building components, and to anticipate and advise of the destructive nature of some of the e21288.

Many consultants and repair contractors fail to accurately identify the root cause of an active water intrusion and recommend unnecessary repairs as a result.

BDG specializes in forensic water intrusion investigations. Far too often, almost on a weekly basis, we receive inquiries that describe ongoing water intrusions that have been repaired repeatedly, e22128 the building still leaks.

ASTM E – 01a Standard Guide for Evaluating Water Leakage of Building Walls

Historical Version s – view previous versions of standard. Give us a call to discuss your next project. Diagnostic testing can also be adapted from in-service quality assurance testing procedures such as Test method E or diagnostic test procedures such as Test Method C, AAMA Need help or have a question? Awareness of safety and familiarity with safe procedures are particularly important for above-ground operations on the exterior of a building and destructive investigative procedures which typically are associated with the work described in this guide.

  HYDROFOAM PLANS PDF

Investigative testing is undergone in order to recreate leaks, trace internal paths of the leaks, correlate test results with observed damage and verify hypothesis using diagnostic test methods and procedures adapted from standard test methods such as E, C, E to meet specific objectives. Referenced Documents purchase separately The documents listed below are referenced within the subject standard but are not provided as part of the standard.

Referenced Documents purchase separately The documents listed below are referenced within the subject standard but are not provided as part of the standard. Through our network of over 43, people in 1, laboratories and offices in countries, Intertek provides quality and safety solutions to a wide range of industries around the world. Link to Active This link will always route to the current Active version of the standard.

Building Diagnostics Group, Inc. It addresses the performance expectations, service history of a wall system, various components of a wall, and the interaction between these components and adjacent construction.

The evaluation of causes may likewise be limited in scope, and the procedures recommended herein abridged according to the professional judgement of the evaluator. The guide provides methodology for a systematic approach to an evaluation, including providing details on the initial evaluation, reviewing the service history, identifying the physical symptoms, visual inspecting reported intrusions, developing a hypothesis, recreating leaks while simulating normal rainfall, tracing and correlating intrusions, verifying the hypothesis, providing a final analysis, and accurately reporting through documentation.

The potential results and benefits of the evaluation program should not be over-represented. Awareness of safety and familiarity with safe procedures are particularly important for above-ground operations on the exterior of a building and destructive investigative procedures which typically are associated with the work described in this guide.

aatm We cannot express the importance of this practice. Building wall systems employing its exterior and interior finishes, fenestration, structural components, and components for maintaining the building interior environment. A wall is considered a system including its exterior and interior finishes, fenestration, structural components, and components for maintaining the building interior environment. Work Item s – proposed revisions of this standard. Establish appropriate safety, health, and environmental practices and determine the applicability of regulatory limitations prior to use.

  ANGLE DEKKOR PDF

Asttm objective is to be as comprehensive as possible astk a defined scope of work. Leakage sources that are localized and unique may remain and may require additional localized evaluation effort. Whether your business is local or global, we can ensure your products meet quality, health, environmental, safety, and social accountability standards for virtually any market around the world. Active view current version of standard.

Professional services based on accurate information that helps you or your company make the right decision aatm your project or asset. Reference is made to design features of a wall only for the purpose of identifying items of interest for consideration in the evaluation process.

The presence of water might result from a roofing problem, a condensation problem, a plumbing problem, operable windows or doors left opened or unlatched or some other condition not directly related to water leakage through the building wall and is outside the scope of this guide.

This guide describes methods for determining and evaluating causes of water leakage of exterior walls. Ee2128 Item s – proposed revisions of this standard.

Establish appropriate safety and health practices and determine the applicability of regulatory limitations prior to use. Our systemic approach, aetm techniques, and attention to detail have made us a recognized leader in forensic water intrusion investigations. For this purpose, water penetration is considered leakage, and therefore problematic, if it exceeds the aztm resistance or temporary retention and drainage capacity of the wall, is causing or ee2128 likely to cause premature deterioration of a building or its contents, or is adversely affecting the performance of other components.

This can lead to multiple costly repairs. Testing Evaluating how your products and services f2128 and exceed quality, safety, sustainability and performance standards. Enabling you to identify and mitigate the intrinsic risk in your operations, supply chains and business processes. The preliminary assessment may also indicate that the wall is not the source of a leak even though it is perceived as such by the building occupant.

Since every possible location is not included in an evaluation program, it is probable that every leak source will not be identified. It addresses the performance expectations and service history of a wall, the various components of a wall, and the interaction between these components and adjacent construction.